  • Zero Emissions Bus Analyses and Rollout Plan- 2023

    Active, Plans

    The Calaveras Transit Agency Zero-Emission Bus (ZEB) Rollout and Implementation Plan provides a roadmap for transitioning Calaveras Connect to a 100% zero-emission fleet by 2040. The plan outlines recommended vehicle purchases, charging infrastructure, facility improvements, funding opportunities, workforce training, and other strategies needed to support a phased transition while continuing to provide reliable transit service to the community.

  • A two-lane road with yellow dividing lines curves through a dry, wooded landscape under a clear blue sky.

    State Route 4 Wagon Trail Realignment Project

    Active, Project

    Phase 2 of the State Route 4 Wagon Trail Realignment Project focuses on improving approximately 3 miles of the eastern segment of the corridor. The proposed alignment will extend from Stallion Way to approximately 1.6 miles west of the State Route 4/49 junction near Stockton Road. Funding for the preparation of Plans, Specifications, and Estimates (PS&E) in the amount of $4.5 million was awarded by the California Transportation Commission at its August 17, 2022 meeting. These funds are provided through the Regional State Transportation Improvement Program (RSTIP). Right-of-way acquisition will be funded through an SB 1 Trade Corridor Enhancement Program (TCEP) grant totaling $5.25 million. The required local match will be provided through the RIM Fund.

  • Construction work

    Caltrans SHOPP Projects

    Active, Plans

    State Highway Operations and Protection Program (SHOPP) Projects

    The SHOPP provides funding for maintaining the State Highway system. Updates on the current SHOPP projects in Calaveras County and their status as maintained by Caltrans District 10 may be found on the site listed below.  

  • SB 743 Implementation Plan for Calaveras County- 2022

    Completed, Plans

    California Senate Bill 743 (SB 743) changed how transportation impacts are evaluated under the California Environmental Quality Act (CEQA). The law determined that automobile delay, commonly measured using Level of Service (LOS) should no longer be treated as an environmental impact. Instead, the California Governor’s Office of Planning and Research (OPR) recommended using Vehicle Miles Traveled (VMT) as the primary metric for transportation analysis

  • Promoting Safe Bicycle Travel Opportunities- 2021 Full Report

    Completed, Project

    This project is new to the 2018/19 Overall Work Program and is being partially funded through Caltrans Transportation Planning Grant funds. Tuolumne County Transportation Council (TCTC), Calaveras Council of Governments (CCOG), San Joaquin Council of Governments (SJCOG), Stanislaus Council of Governments (StanCOG), and Alpine County LTC (ACLTC), in collaboration with the California Bicycle Coalition Education Fund (CBC) will promote safe multimodal travel in our region and improve and promote bicycle tourism for economic development with an emphasis on improving disadvantaged, low income Rural Communities and Small Cities.

  • Valley Springs Town Center Connectivity Plan- 2020

    Completed, Plans

    The Calaveras Council of Governments (CCOG) and County of Calaveras applied for and received a State transportation planning grant for FY 2017/18, made possible through Senate Bill 1 (SB 1), to complete a Complete Streets Capital Infrastructure Plan for Valley Springs. The Plan will provide for the community level planning needed to develop conceptual complete streets transportation improvements that build upon operational investments on SR 26 and the SR 12/26 intersection, incorporates community aesthetic, and provides safe travel options for residents and students to schools and community centers. The project is a collaborative partnership of the School, Caltrans, CHP, CCOG, County, and community. The Plan will explore multi-modal improvements within the Historic Town including streets serving as School pick up and drop off locations. The project includes an assessment of existing conditions, comprehensive public participation and outreach, conceptual design alternatives, development of a Complete Streets Plan and implementation and financial plan.

  • San Andreas Pope St and Safe Routes to School Gap Fill Plan- 2020

    Completed, Plans

    The San Andreas Pope Street and Safe Routes to School Gap Fill Plan identifies improvements to make walking and bicycling safer and more accessible in central San Andreas. The plan focuses on improving connections between residential neighborhoods, San Andreas Elementary School, the Government Center, and other community destinations through projects such as a multiuse path, improved crossings, and other pedestrian and bicycle safety improvements.

  • Angels Camp North Main Street/SR 49 Complete Streets Corridor Plan and Copello Road Pedestrian Connector- 2020

    Completed, Plans

    The Calaveras Council of Governments (CCOG) and City of Angels applied for and received a 2017/18 Sustainable Transportation Planning Grant through Caltrans made possible through Senate Bill 1. The CCOG serves as the eligible applicant, while the City will serve as project lead. The project will incorporate transit and other pedestrian safety improvements on SR 49 in the northern area of Angels Camp. The process will provide for facilitated community and stakeholder outreach and will result in conceptual designs and necessary technical data for a competitive Active Transportation Program grant application.

  • Murphys SR 4 Complete Streets Corridor Plan and Project Prioritization-2019

    Completed, Project

    The Murphys SR 4 Complete Streets Plan, completed in 2019, provides a long-term vision for improving safety, accessibility, and mobility along State Route 4 through Murphys. The plan focuses on creating safer connections for pedestrians, bicyclists, motorists, and transit users while improving access to schools, parks, businesses, and downtown Murphys.

  • San Andreas SR 49 Commercial Gateway & Corridor Study- 2015

    Completed, Plans

    The San Andreas Gateway Corridor Study began in December of 2015 and was a partnership between the County of Calaveras, CCOG, Caltrans, and the local community. The Study focused on the southern gateway to the community and identified the transportation improvements including local road networks and multi-modal transportation alternatives necessary to accommodate the planned land uses in the study area while protecting and advancing the function, design, and economic vitality of SR 49. Through a coordinated planning process, the Study collectively plotted future transportation strategies to improve corridor safety, access, aesthetics, and mobility.

  • Angels Camp Main Street Plan- 2015

    Completed, Plans

    This project is a collaborative effort with The City of Angels, Calaveras Council of Governments and Caltrans to address community design, public spaces, bicycle and pedestrian facilities and parking facilities along the Main Street Angels Camp corridor. The study area extends from the intersection of Vallecito Road along the 49 Corridor to Murphys Grade Intersection. The study has focused on input from the community through the City, CCOG, stakeholders and public meetings to develop the design elements, guidelines and strategies to guide future improvements along the SR 49 Corridor. The project began in December of 2015. The project team has hosted various public outreach events and opportunities for feedback including three public workshops, two walking tours, one-on-one stakeholder meetings, online surveys and five Advisory Committee meetings. The last public workshop was in January of 2017 and was the final round of public input prior to release of a draft plan for public review and feedback. The Final Plan was adopted by the City of Angels City Council on August 1, 2017 and accepted by the CCOG Board on August 2, 2017. The City and CCOG will utilize this plan, along with the community and other stakeholders, to seek funding and identify avenues for implementation of priority improvements. The City currently has two construction projects along this corridor that will look to incorporate recommendations and concepts from this Plan, those include the SR 49 sidewalk gap fill and Murphys Grade Road sidewalks and intersection improvements.

  • UPLAN

    Completed, Plans

    UPlan, developed by the UC Davis Information Center for the Environment (ICE), is a Geographic Information System (GIS) based urban growth modeling tool used for advanced regional transportation planning. The tool is used to help regions study the interaction of regional population and economic growth and development policy by projecting future land-use patterns. UPlan allows us to illustrate how different growth alternatives would affect the region’s transportation system, air quality, housing, and natural resource production, among other issues. The output of UPlan is provided in a user-friendly map format designed to facilitate regional consensus building and enhance the decision making process. Output from UPlan is also used as input to other models such as the regional travel demand model to estimate the impact of land use alternatives on the transportation network.